Project Included construction of 1200 sf imaging suite within the operating suites at Emory Saint Josephs Hospital. Project included all new electrical, mechanical, medical gases, as well as advanced infrastructure for low voltage/audio visual connectivity. Project included careful coordination with Siemens, Stryker, Storz, and various other vendors. Due to the nature of the project and the location, the project included a high level of ICRA coordination. The project was 16 weeks in duration for construction.